Introduction

Jhamolongma Hydro Power Development Company Pvt. Ltd was registered in the year 2058 at Company Registrar Office and was registered in the year 2069 at Government of Nepal, Ministry of Industry, and Industry Department. Surya Bahadur KC is the founder chair person of this Hydro Power Company. Its registered office at the time of registration is at Pokhara Sub Metropolitan ward no 11 Rani Pauwa. At the time of registration at Company Registrar Office its authorized capital was 9 Crore and Issued Capital is Rs 2 crore. Major Portion of share has been invested by Surya Bahadur KC, Roshan KC, Prem Kumari KC, Mahendra Bahadur Godar and Mrs. Saraswati Poudel . We are in the process to amend the on Neyamawali, Prabanda Patra and other wherever it is necessary. We are in process to verify the latest shareholding pattern from Company Registrar Office.

Till today we have obtained Generation Survey Licence, Transmission Survey Licence has been obtained. PPA has been concluded, Connection agreement signed with Nea, TOR has been approved and EIA will complete within June 2018.

Board of Directors

1. Surya Bahadur KC Chairman
2. Roshan KC Managing Director
3. Mrs. Prem Kumari KC Director
4. Mr. Mahendra Bahadur Godar Director
5. Mrs. Saraswati Poudel Director

Salient Features

Developer Jhayamolongma Hydro Power Development Pvt. Ltd
Project Upper Seti  Hydropower Project
District Kaski
Location of Project Site Machhapuchchhre Rural Municipality
Water Source Seti Khola
Type of Scheme RoR
Installed Capacity 32000 KW
Gross head 248.45m
Rated Design head 241.85 m
Design Discharge 15.30m3/s
CatchmentArea hydrology 234 km²
Head works D- Shaped weir 12.50m
Weir Crest Elevation EL 1516 m
Under sluice Vertical lift fixed wheel type
Intake Type Side Intake with 9.00 m * 2.80m
Desander Surface
Penstock Pipe  Exposed Surface  2030m -2.50m
Pipe Material Mild steel (IS 2062-B)
Length 850.50m
Powerhouse Surface Rcc (28.00m x20.00m)
Tailrace Rectangular  RCC, 252.17m
Turbine Vertical axis francis
Transmission 7km, 132kV Single Circuit
Interconnection/Metering Point NEA 132 kV at Baskot Hemja Substation
Deemed Generation 169.157GWh
Construction Started 2074 Ashwin
COD/Commissioned date 2079  Baishak 12 Purposed
Rate per unit of energy Rs 4.80 for wet season and 8.40 For dry season.
Annual Revenue Rs 86 crore, 74 Lakh, 27 thousand, 943.
Project Cost without IDC Nrs 3,80,80,00,000
Total Cost at Commissioning Rs 5 Arba 71 Crore Estimated
Debt : Equity 70 : 30
Financed by Century Commercial Bank as lead bank Nepal Investment Bank, Clean energy Development Bank, Laxmi Bank as coalition bank.