Developer |
Gandaki Hydro Power Development Company Pvt. Ltd |
Project |
Mardi Khola Small Hydro Power Project |
Development Region |
Western Development Region |
District |
Kaski, Pokhara city |
Located At |
Rivan Vdc, and Lwangghalel Vdc Machhapuchchhre Rural Municipality |
Location of Power |
Kaphalbot, Rivan VDC |
Water Source |
Mardi River |
Type of Scheme |
Run Of River |
Access Road to Head pond |
15 km from HemjaMilanchowk, Pokhara |
Mean annual discharge |
8.51m³/sec |
Design Discharge |
3.28m3/sec |
Intake |
Inlet gate to headpond near cross regulator |
Location |
Barahthan, Luwangghalel |
Forebay |
RCC Closed Canal |
Design WL at Forebay |
1350.206m |
RCC Closed Canal |
2000m |
Penstock Type |
Mild Steel (1.1to 1.2m dia) pipe |
Length of Penstock |
1238.3m |
Powerhouse |
Surface RCC Structure |
Tailrace |
Rectangular RCC |
Turbine |
3 units |
Generator |
SFW1600-12/1730 2000KVA AND 4000 KVA |
Transformer |
3 Phase, ONAN 2000 KVA AND 4000 KVA |
Transmission |
33kV, 5.5 km. |
Interconnection Point |
NEA 33kV, Modi Substation |
Installed Capacity |
4800kW |
Gross Head |
33.0 m |
Deemed Energy |
32.526GWh |
PPA date |
3.1 MW was done on 2060/07/07 and 1.7 MW was done on 2068/10/15 |
Construction Started |
2065 |
CoD Date |
3.1 MW was done on 2066/10/8 and 1.7 MW was done on 2070/07/07 |
Rate of PPA |
Rs 3.90 and Rs 5.52 For Wet season |
Annual Revenue |
Around 12 Crore |
Wet season |
Baishakh to Mangsir |
Dry Season |
Poush to Chaitra |
Cost of the Project with IDC |
Around 90 Crore |
Loan/Equity Ratio |
70:30 |
Financing Bank |
Nepal Investment Bank,RastriyaBanijya Bank. |