Developer Gandaki Hydro Power Development Company Pvt. Ltd
Project Mardi Khola Small Hydro Power Project
Development Region Western Development Region
District Kaski, Pokhara city
Located At Rivan Vdc, and Lwangghalel Vdc Machhapuchchhre Rural Municipality
Location of Power Kaphalbot, Rivan VDC
Water Source Mardi River
Type of Scheme Run Of River
Access Road to Head pond 15 km from HemjaMilanchowk, Pokhara
Mean annual discharge 8.51m³/sec
Design Discharge 3.28m3/sec
Intake Inlet gate to headpond near cross regulator
Location Barahthan, Luwangghalel
Forebay RCC Closed Canal
Design WL at Forebay 1350.206m
RCC Closed  Canal 2000m
Penstock Type Mild Steel (1.1to 1.2m dia) pipe
Length of Penstock 1238.3m
Powerhouse Surface RCC Structure
Tailrace Rectangular RCC
Turbine 3 units
Generator SFW1600-12/1730 2000KVA AND 4000 KVA
Transformer 3 Phase, ONAN 2000 KVA AND 4000 KVA
Transmission 33kV, 5.5 km.
Interconnection Point NEA 33kV, Modi Substation
Installed Capacity 4800kW
Gross Head 33.0 m
Deemed Energy 32.526GWh
PPA date 3.1 MW was done on 2060/07/07 and 1.7 MW was done on 2068/10/15
Construction Started  2065
CoD Date 3.1 MW was done on 2066/10/8 and 1.7 MW was done on 2070/07/07
Rate of PPA Rs 3.90 and Rs 5.52 For Wet season
Annual Revenue Around 12 Crore
Wet season Baishakh to Mangsir
Dry Season Poush to Chaitra
Cost of the Project with IDC Around 90 Crore
Loan/Equity Ratio 70:30
Financing Bank Nepal Investment Bank,RastriyaBanijya Bank.