Salient Features

Developer United Idi Mardi and Rb Hydro Power Pvt. Ltd
Project Upper Mardi Khola  Hydropower Project
District Kaski
Location of Project Site Machhapuchchhre Rural Municipality
Water Source Mardi Khola
Type of Scheme RoR
Access Road 6 km
Installed Capacity 7000 kW
Gross head 335m
Rated Design head 318.58 m
Design Discharge 2.60m3/s
Catchment Area at Intake 39.87 km
Probability of  Excedance 50 %
Head works Ogee Shaped Concrete weir 10m
Weir Crest Elevation EL 1650 m
Under sluice 2 vertical sluice gates
Intake Type Side Intake with Orifice Opening
Connecting Channel 80m RCC Rectangular
Gravel Trap Gravity Flushing
Headrace Canal Rcc tank, 157.803³
Desander Double Chambered Gravity flushing
Penstock Pipe Surface  1.20m dia
Pipe Material Mild steel (IS 2062-B)
Length 3700m
Number of Anchor Blocks 72 nos. including Y and Bellmouth block
Powerhouse Surface Rcc (27.50mx16.20m)
Tailrace Rectangular  RCC, 80m
Turbine Pelton,Horizontal axis 2 units
Transmission 11km, 33kV Single Circuit
Interconnection/Metering Point NEA 132 kV at Baskot Hemja Substation
Deemed Generation 35.880 GWh
Construction Started 2073 Falgun
COD/Commissioned date 2075 Sharawan 1st Purposed
Rate per unit of energy Rs 4.80 for wet season and 8.40 For dry season.
Annual Revenue Rs 18 Crore , 39 Lakhs, 8 thousand 1 Hundred 39
Project Cost without IDC Nrs 93.75 Million
Total Cost at Commissioning Rs 125 Million
Debt : Equity 75 : 25
Financed by Prime Commercial Bank Limited as lead bank and Century Commercial Bank and Janata Bank as coalition bank.