Vijayapur II small hydro power project 4.5MW was registered in the year 2066 at company registrar office and later it was registered on Nepal Government, Ministry of Industry, and Industry department. Major shareholders of our hydro power are Surya Bahadur KC, Roshan KC, Mrs Prem Kumari KC, Kiran KC.

Till January 2018 we have completed following works.

  • Survey License Obtained.
  • PPA Signed with NEA.
  • TOR and Scoping for EIA Approved.
  • Generation License Approved.
  • Financial closure has been finished.

Salient Features

Developer Civil Hydro Power Pvt. Ltd
Project Bijayapur ii Small Hydropower Project
District Kaski
Location of Project Site Lekhnath Municipality -3
Water Source Bijayapur Khola
Type of Scheme Cascade of Bijayapur Hydro Power Project I
Installed Capacity 4500 KW
Gross head 57m
Rated Design head 54.39 m
Design Discharge 9.80m3/s
Catchment Area hydrology 63.50 km²
Head works Rectangular with flushing
Weir Crest Elevation EL681.35 m
Penstock Pipe  Steel Pipe 2427 m  10mm- 16mm thickness
Pipe Material Steel
Length 2427m
Powerhouse Surface  (25.20.00m x20.00m* 11.83mm* 9.76 m)
Tailrace Rectangular  RCC, 252.17m
Turbine Horizontal axis francis
Transmission 3.3km, 33kV Single Circuit
Interconnection/Metering Point BSHO I HP Switchyard then Common Line to Nea Lekhnath substation.
Average annual energy after outage. 28..973GWh
Construction Started 2074 Ashwin
COD/Commissioned date 2075  Ashadh 32 Purposed
Rate per unit of energy Rs 4.80 for wet season and 8.40 For dry season. Escalation up to 5 Years
Annual Revenue Rs 15 Crore, 99 Lakh, 14 Thousand, 167.
Project Cost without IDC Nrs 718 Million
Total Cost at Commissioning Rs 957 Million
Debt : Equity 75 : 25
Financed by Kumari Bank as lead bank, Century Commercial Bank, Janata Bank Nepal as coalition bank.